The scope of CCC certification for motor vehicles shall be in accordance with the requirements of the Implementing Rules for vehicles of category M, N and O (including complete vehicles and non-integrated vehicles). The certification according to the general safety standards eg GB 7258 "technical requirements for the safe operation of motor vehicles", For specific product inspection articles, please refer to the implementation rules of CNCA-C11-01: 2014 Automotive Annex 1 Type Test Projects and Standards.

1, How long does it take from the application to the receipt of the certificate?

90 days are set by law for cetification. According to experience, these sometimes take longer.

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: up to 10 man day per model series, depending of subparts certified

FI audit: up to 6 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is the audit conducted?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

  1. Application form
  2. License in copy-استعلامات بما في ذلك معلومات موجزة عن الشركة ، عملية الإنتاج ، قائمة مرافق الإنتاج الأساسية ، قائمة بأدوات الاختبار الأساسية ، دليل على علامة تجارية مسجلة ، إلخ.
  3. Car structure and technical parameters
  4. COP control plan
  5. Declaration: how is type, series defined
  6. Declaration: how is VIN defined
  7. Explanation: we distinguish the different types by external marking
  8. Declaration: Operating instructions in Chinese
  9. COC certificate
  10. Review
  11. Quality Manual
  12. Quality system certificates in copy
  13. Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

أخبار CCC

جيلي إعداد مركز البحث والتطوير في ألمانيا جيلي إعداد مركز البحث والتطوير في ألمانيا 2019-05-18 - وفقا لخدمة أخبار الصين بكين في مايو 16 أن ...
قواعد تنفيذ معدات النقل بالسكك الحديدية الحضرية قواعد تنفيذ معدات النقل بالسكك الحديدية الحضرية 2019-05-06 - وفقا لإعلان صدر مؤخرا من الصين شهادة ...
تحديث نطاقات العمل لمختبرات الاختبار لمنتجات CCC China تحديث نطاقات العمل لمختبرات الاختبار لمنتجات CCC China 2019-04-29 - نطاقات العمل في مختبرات اختبار مختارة للصين CCC ...
أصدرت 21 معايير GB الجديدة والمعدلة أصدرت 21 معايير GB الجديدة والمعدلة 2019-04-19 - وفقا للصحافة الأخيرة من مجلس الدولة لجمهورية الصين الشعبية ، ...
أصدرت 177 معايير GB الجديدة والمعدلة أصدرت 177 معايير GB الجديدة والمعدلة 2019-04-04 - وفقا للصحافة الأخيرة من مجلس الدولة لجمهورية الصين الشعبية ، ...
ستستثمر دايملر 500 مليون يورو لإنتاج السيارات الكهربائية ستستثمر دايملر 500 مليون يورو لإنتاج السيارات الكهربائية 2019-03-24 - ستستثمر مجموعة دايملر 500 مليون يورو (تقريبًا ...
تحديث معايير GB لمنتجات السيارات الصينية CCC تحديث معايير GB لمنتجات السيارات الصينية CCC 2019-03-17 - وفقا لإعلان صدر مؤخرا عن CNCA (الصين الوطنية ...
تسلا موديل 3 - حفل تسليم سوق الصين تسلا موديل 3 - حفل تسليم سوق الصين 2019-03-15 - في يناير 22 ، 2019 ، حفل تسليم نموذج 3 China Market ...
محرك عاكس المنتج شهادة علامة CCAP محرك عاكس المنتج شهادة علامة CCAP 2019-03-12 - من أجل تنفيذ روح المجلس الوطني الصيني ...
قواعد التنفيذ التفصيلية للمعدات السمعية والبصرية المنقحة قواعد التنفيذ التفصيلية للمعدات السمعية والبصرية المنقحة 2019-03-10 - مراجعة مركز الجودة الصين (CQC) التنظيم ...

الدعم

Unterstützung

كنت تعمل في الوتيرة الخاصة بك. يمكنك التعامل مع المشاريع الخاصة بك بشكل مستقل من خلال بوابتنا ، فضلا عن الاستفسار عن الدعم الشخصي. لذلك ألزمنا أنفسنا بالفرصة لتصميم العمليات الخاصة بك

الإدارة عبر الإنترنت

الإدارة عبر الإنترنت

نحن نقدم لك الفرصة لتنفيذ عملية الاعتماد الخاصة بك ، ولكن دون الحاجة إلى التخلي عن الدراية أو الدعم من الموظفين ذوي الخبرة. تم تصميم النظام على الانترنت لمجموعة متنوعة من الشهادات ويقدم لك ولوائح التعليمات، فضلا عن أشكال الجاهزة والجداول، وكذلك وحدة نمطية لتوضيح الأسئلة المفتوحة مع أحد موظفينا.

تغيير الشهادة

تغيير الشهادة

في وقتنا السريع التغييرات في حياة العمل هي مرافقة مستمرة. يمكن تحطيمه بسرعة كبيرة. هناك أسباب داخلية وخارجية لهذا. يوفر CS نظرة عامة حول التوافق أثناء التغييرات.

تعاون

التكتلات

لدينا فقط وقت محدود وقدرة مالية ، ونريد تقديم خدمة شاملة ، فإن التعاون يكون منطقيًا فقط بين المنظمات ذات الصلة. هذه لديها هيكل موثوق ، فضلا عن انسجام جيد بين الأشخاص.

اذهب الى القمة